HVAC and Building Systems
Aniruddha Chowdhury · Ruston, Louisiana · ani.nitjsr@gmail.com
A validation-first perspective on HVAC systems.
I bring hands-on HVAC sub-assembly validation and mechanical engineering education to building systems opportunities. I released about 30 validated units per month at 100% first-pass yield and have passed the PE Mechanical: HVAC and Refrigeration exam.
Core competencies
Applied: professional use · Research: doctoral or research use · Developing: current study
HVAC sub-assembly validationApplied
Leak & pressure testingApplied
Airflow verificationApplied
Material & energy balancesApplied
CAD and Revit modelingApplied
PE HVAC examApplied
Relevant experience & projects
Assistant Mechanical Engineer · Quality Control
Aug 2016–Dec 2017AFTAB Automobiles Ltd. · Bangladesh
- Validated bus HVAC sub-assemblies through leak, pressure-integrity and airflow testing, releasing about 30 units per month at 100% first-pass yield.
- Prepared engineering documentation and modeled chassis and prototype components in SolidWorks and AutoCAD.
Process Engineer · Production Officer
Jan 2018–Dec 2020Hydrogen Peroxide Plant · Al-Razi Chemical Complex Ltd. · Bangladesh
- Modeled material and energy balances in Aspen Plus, applying thermofluid reasoning to industrial process operation.
- Monitored and optimized VDU/SRU units using DCS; contributed to distillation improvement that raised Cpk from approximately 1.14 to 1.4.
Let’s talk about your team.
Open to relocation · HVAC and Building Systems